[an error occurred while processing this directive]

Advertising  ||   Bookmark This Page  ||   Make This My Homepage  ||   Link To Us  ||   Tell a Friend  ||   Search
 

Home

UK Projects

International Projects

Contractor News

Industry Moves

Contractors'
Guides

Technical Toolbox

Glossary

Jacobs Receives Contract from Saudi Aramco

Jacobs LogoJacobs Engineering Group Inc. have received a contract to provide the basic design package for a 900 ton per day (TPD) sulfur recovery unit (SRU) for the Khursaniyah Gas Plant in Saudi Arabia.

The new SRU will use Jacobs' proprietary SUPERCLAUS(R) technology to recover sulfur from acid gas feed streams to produce molten elemental sulfur. It will be designed to achieve 99 percent sulfur recovery at the end of a 2- year run. This 900 TPD SRU train will be added in parallel to three SUPERCLAUS(R) trains now under construction. Together, the four units will recover 3600 TPD of sulfur during normal operations.

With over 20 operating units in five locations, Saudi Aramco has the largest fleet of SUPERCLAUS(R) plants in the world.

Jacobs now has over 30 sulfur projects in development worldwide, representing a total recovery of over 25,000 TPD. Since 1985, over 300 units have been built -- 200 of which utilize SUPERCLAUS(R) technology.

Find out more about
Jacobs
Saudi Aramco

Search for more Jacobs News

Posted 03/07/07

Back


Get Listed  ||   Advertising Opportunity  ||   About Us  ||   Contact Us  ||   Legal

© Copyright 2007. All rights reserved.