Do you want to pay less tax? Up to 25% more in your pocket.

Bookmark This Page  ||   Make This My Homepage  ||   Link To Us  ||   Tell a Friend  ||   Search
 

Home

UK Projects

International Projects

Contractor News

Industry Moves

Contractors'
Guides

Contractors'
Profiles

Technical Toolbox

Glossary

Technip Awarded Pipeline Contract by BG Trinidad and Tobago

Technip LogoTechnip has been awarded a contract by BG Trinidad and Tobago for the flowlines(1), risers(2), and umbilicals(3) for the North Coast Marine Area (NCMA) Development, offshore Trinidad.

The contract includes engineering, procurement, fabrication, installation, and pre-commissioning of the insulated riser, flowline and umbilical systems that will connect the Eastern Hibiscus and the Chaconia subsea wells to the Hibiscus Platform. The location is twenty-five miles northwest of Trinidad in NCMA Block 01 (East Hibiscus and Chaconia reservoirs) in 500 feet of water.

The work also includes engineering, fabrication and installation of two insulated steel flowlines with two flexible risers as well as the engineering, supply, installation, and pre-commissioning of two hydraulic control umbilicals. The detailed design engineering will be performed by Technip's operations and engineering center in Houston.

The high-pressure flexible risers will be manufactured by Flexi France, one of the Group's flexible pipe plants, located in Le Trait (France) while the hydraulic control umbilicals will be manufactured by Technip's UK subsidiary, Duco, based in Newcastle. Fabrication of the rigid flowline will take place at Technip's spoolbase in Evanton (UK).

The offshore installation phase will use two vessels from Technip's fleet: the Apache will lay the flowlines while the Wellservicer will install the flexible risers and umbilicals and offer diving and ROV(4) support for the completion of the work.

(1) Flowline: pipe laid on the seabed for the transportation of production or injection fluids. It is generally an infield line, linking a subsea structure (wellhead, template, manifold or riser base) to another structure or to a production facility. Its length ranges from a few hundred meters to several kilometers and its diameter from 4" to 19".

(2) Flexible riser: a vertical flexible pipeline linking flowlines to surface structures.

(3) Umbilical: an assembly of hydraulic hoses which can also include electrical cables or optic fibers, used to control a subsea structure or ROV from a platform or a vessel.

(4) ROV (Remotely Operated Vehicle): an unmanned subsea vehicle remotely controlled from a vessel or an offshore platform. It is equipped with manipulator arms, which enable it to perform simple operations.

Find out more about:
Technip
BG Group

Search for more Technip News

Posted 25/04/06

Back


Get Listed  ||   Advertising Opportunity  ||   About Us  ||   Contact Us  ||   Legal

© Copyright 2006. All rights reserved.